Shower maintenance skills

2022-04-14 09:57

1. Please invite experienced professionals to carry out construction and installation. When installing, the flower asperses should not knock against with hard thing as far as possible, do not wait for cement, glue to remain in the surface, lest damage surface coating burnish. Special attention should be paid to the removal of debris in the pipeline before installation, otherwise it will cause the shower to be blocked by debris in the pipeline, thus affecting the use.

2. Be in water pressure not under 0.02mPa (namely 0.2 KGF/cubic centimeter) below the circumstance, after using period of time, if discover yield water is reduced, appear water heater flameout to wait for a phenomenon even, can be in the outlet place that the flower asperse gently twist next screen net cover, clear impurity, can restore commonly as before. But remember not to forcibly disassemble the flower asperse, because the internal structure of the flower is complex, non-professional forced disassembly will lead to the flower asperse can not restore the original.

3. Switch the faucet of flower shower and adjust the way of flower shower water do not exert too much force, and gently rotate. Although be the faucet of traditional type, also need not spend very big strength. Pay special attention not to use the faucet handle and shower bracket as handrails to support or use.

4. The metal hose of the shower head should be kept in a natural stretch state and not coiled on the faucet when not in use. At the same time, pay attention to hose and faucet joints do not form a dead Angle, so as not to break or damage the hose.


SHOWER COLUMNSLIDING RAIL

name:
Message:
Verification code:
submit
Comment
contact us
Tel:0086-13336645900


Whatsapp:86-13336645900


E-mail: chinasanitary@aliyun.com
xt@nbxintao.com


Add:Cangtian Industrial Zone,Changhe Town,CiXi city,
Zhejiang Province,China


  • Name*

    *
  • Email

  • Phone

  • Message